Central City, Iowa
The 2009 project included paving of 2nd and 3rd Street from Barber Street to Grove Street, along with water main replacement, sidewalk and drainage improvements. The six inch concrete pavement totaled 3,200 square yards. With this area being just south of the high school, a 41 foot concrete pavement provided adequate width for parallel parking on both sides.