Central City, Iowa
The City constructed a two-thirds mile long, 8-foot-wide concrete trail along the Wapsipinicon River in 2008. The 5″ concrete pavement included about 3,200 square yards.
Benches were installed along the trail in convenient locations with two kiosks. Decorative paving inserts and retaining wall were also included in the project. The trail will ultimately connect to County trails originating in Pinicon Ridge Park.